1 Watty = 1 MWh verified renewable electricity. Issued, tracked, and retired in an auditable registry designed to prevent double counting.
One WTY represents one measured, traceable, documented megawatt-hour. Non-speculative: every WTY is backed by verified generation data and audit-ready evidence.
Timestamp · Action · Role · Hash
Evidence-first pipeline from measurement to integration.
IoT, SCADA, and registry data ingestion.
Rules and versioned EF_Master reference data.
Build the Evidence Pack—auditable dossier.
API, reporting, and audit replay.
Answers questions about methodology, security, APIs, and use cases—and helps route you to the right resources.
Hi, I'm the WATTii assistant. I can answer questions about methodology, security/governance, APIs, and use cases. Which profile fits you best: Government, Producer, Industry, Finance, Audit, or Developer?
Transparency: answers are based on published docs; the assistant may be wrong. Consent & privacy: limited retention, opt-out. No promises of returns or financial value.
Built to be challenged—and hold.
* Demo values. Actual factors from EF_Master.
Keys, signatures, timestamps, tamper-evident logs. RBAC, role separation, auditor access. EF_Master governance and audit export + replay.
Keys, signatures, timestamps, tamper-evident logs.
RBAC, role separation, auditor read + replay access.
EF_Master versions, change rationale, audit export + replay.
Sovereign registries, cross-border interoperability, policy alignment.
Issue and document generation with verified evidence packs.
Procure and retire WTY for Scope 2 and sustainability claims.
Evidence-backed assets and audit-ready reporting for financiers.
Read and replay calculations, export signed packs, verify chain.
API keys, webhooks, and integrations with existing systems.
Indicative estimate. Audited proof relies on real project data in MyWATTii.
Indicative estimate only. Audited proof relies on real project data inside MyWATTii.
Cockpit for proven MWh: assets, evidence, audits, integrations.
Security Brief, White Paper, One-pager. Enter your professional email to download.
Professional email required for download.
Tell us about your organization and use case.
Illustrative roadmap targets for demonstration purposes.
Initial deployment with 2-3 partner countries, 10+ renewable projects, and select corporate buyers
Integration with existing national registries and interoperability protocols
Pan-African expansion with standardized cross-border settlement and financing mechanisms
Illustrative projections: Watty starts at 562 certified units in 2026 with 15% annual growth target reaching 8.5M by 2040.
Enter a certificate hash (proof chain hash) or public ID to verify certificate authenticity and view details. This is a public verification.
Explore renewable energy project locations around the world
0 locations found
Loading locations...